World Wide Engineering has asked me to be the electrical consulting engineer on a hydro electrical plant design, purchase and installation of a 400 KW Pelton wheel hydro plant. I have spent many hours and three trips to Germany developing, reviewing drawings, and coordinating the electrical controls for this installation at Mbingo Hospital. This picture was taken at the factory testing in Germany this past April. The controls are now finished and the equipment is in storage waiting for Mbingo hospital to tell them to release the equipment to Cameroon. The political and security situation in Cameroon is tenuous at best.